Agoco Verbal Logo

 

login en

Arabec Headder

 

 

Main Tenders Committee

 

Dead Line     Comments BOOKlET PRICELOCATIONPROJECT TITLE.BIO
2018/08/15     Tobruk MAINTENANCE OF JETTY PILES AND REPLACEMENT OF CATHODIC PROTECTION SYSTEM AT MARSA AL HARIGAH PROJECT No: P-33 MTC-38-2018
2018/08/08   L.D 3000 Tobruk REPLACEMENT OF TWO WET GAS COMPRESSORS AT CRUDE UNIT TOBRUK REFINERY PROJECT NO. P-27 MTC-35-2018
2018/08/06   L.D 1000 Tobruk The construction of the laboratory building at Tobruk refinery project No: E-33 MTC-07-2018
2018/08/06   - REPLACEMENT OF WOODEN POLES AT SARIR-MESSAL OIL FIELD MCT-36-2018
2018/08/14   L.D 3000 Hamada  INSTALLATION OF FIRE DETECTION IN THE ACCOMMODATION AND FACILITIES AREAS IN HAMADA FIELD NC-8 Project No. O-42 mtc-41-2018
2018/08/01   L.D 3000 NAFOORA  Construction of workshop for high pressure Compressor at CPS at Nafoora field Project No. P-04 mtc-33-2018
2018/08/01   L.D 2000 Benghazi Installation of fire detection system in generator buildings and tie-ins to MACP main Office HQ El-kish project No: J-99 mtc-10-2018
2018/07/25   L.D 2000 Sarir- Messla Construct of Fire Training Ground Facility at Ghanfooda Project No. J-96 MTC-2018-09
2018/07/25   L.D 2000 Sarir Install 2- phase production separator and three shipping pumps at GC-3 project No: M-15 MTC-2018-05
    - Benghazi Construct of Fire Training Ground Facility at Ghanfooda Project No. J-96 MTC-27-2018
2018/07/11   L.D 3000 Benghazi Renovation & maintenance of the guest house and new VIP dining hall, bakery, food/floor store, at Elkish AGOCO H/Q area-Benghazi MTC-34-2018
2018/07/04   L.D 3000 NAFOORA  Replacement of Three Desalters and Three Oil Heaters at Nafoora CPS (Unit) Project No. L-36 MTC-28-2018
2018/07/11   L.D 3000 Sarir Extension of control room at GC-4 Sarir field Project No. I-61 MTC-26-2018
2018/07/11   L.D 3000 Messla Construction of roads to airport and inside field at Messla field Project No. K-34 MTC-25-2018
2018/07/11   L.D 3000 Sarir Construction of the Engineering & Operation Building at Sarir Refinery Project No. M-01 MTC-24-2018
2018/07/09   L.D 3000 MAJID RENEWAL OF FOAM EQUIPMENT WATER SPRAY AND FOAM SYSTEMS ON TANKS IN MAJID PROJECT NO. O-41 MTC-32-2018
2018/07/09   L.D 3000 NAFOORA  STUDY, TREATMENT OF RADIOACTIVELY CONTAMINATED EQUIPMENT AND DISPOSAL METHODS (NORM) - NAFOORA FIELD PROJECT P-31 MTC-31-2018
2018/07/09   L.D 3000 Hamada  Hamada Electrical power system study project No O-73 MTC-30-2018
2018/07/09   L.D 3000 Beda Water Injection system at (Kotla) Beda field Project No. O-77 MTC-29-2018
    - Messla Replacement of motor speed control system for gas compressor Messla oil field project No: P-35 MTC-01-2018
2018/07/09   L.D 3000 Tobruk MAINTENANCE OF JETTY PILES AND REPLACEMENT OF CATHODIC PROTECTION SYSTEM AT MARSA AL HARIGAH PROJECT No: P-33 MTC-38-2018
2018/05/28   - Messla Replacement of motor speed control system for gas compressor Messla oil field project No: P-35 MTC-01-2018
2018/07/02   L.D 3000 Sarir REPLACEMENT OF WOODEN POLES AT SARIR-MESSAL OIL FIELD MTC-36-2018
2018/07/02   L.D 3000 Tobruk REPLACEMENT OF TWO WET GAS COMPRESSORS AT CRUDE UNIT TOBRUK REFINERY PROJECT NO. P-27 MTC-35-2018
2018/06/25   L.D 1000 Tobruk The construction of the laboratory building at Tobruk refinery project No: E-33 MTC-07-2018
2018/06/07

- Nafoora Replacement of Three Desalters and Three Oil Heaters at Nafoora CPS (Unit) Project No. L-36 MTC-28-2018
2018/05/07    - Sarir Install 2- phase production separator and three shipping pumps at GC-3 project No: M-15 MTC-05-2018
2018/05/09   - Sarir/Messla/Majed Engineering study for the upgrading of existing flare/relief systems at Sarir/Messla/Majed project No: O-26, O-27,O-28 MTC-09-2018
2018-06-11   L.D 3000 Benghazi Renovation & maintenance of the guest house and new VIP dining hall, bakery, food/floor store, at Elkish AGOCO H/Q area-Benghazi MTC-34-2018
2018-06-11   L.D 3000 Nafoora Construction of workshop for high pressure Compressor at CPS at Nafoora field Project No. P-04 MTC-33-2018
2018-05-6     Nafoora Replacement of two desalters and two oil heater at Nafoora CPS(non-unit) project No: L-35 MTC-06-2018
    L.D 3000 Construct of Fire Training Ground Facility at Ghanfooda Project No. J-96 MTC-27-2018
2018-06-06   L.D 3000 Extension of control room at GC-4 Sarir field Project No. I-61 MTC-26-2018
201806/04   L.D 3000 MAJID RENEWAL OF FOAM EQUIPMENT WATER SPRAY AND FOAM SYSTEMS ON TANKS IN MAJID PROJECT NO. O-41 MTC32-2018
2018/06/04   L.D 3000 Nafoora STUDY, TREATMENT OF RADIOACTIVELY CONTAMINATED EQUIPMENT AND DISPOSAL METHODS (NORM) - NAFOORA FIELD PROJECT P-31 MTC-31-2018
29/04/2018    - Nafoora Replacement of two desalters and two oil heater at Nafoora CPS(non-unit) project No: L-35 MTC-06-2018
30/04/2018    - Hamada oil field Study for water disposal system for the Hamada oil field project No: I-08 MTC-04-2018
30/05/2018    L.D 3000 Beda field Hamada Electrical power system study project No O-73 MTC-30-2018
30/05/2018    L.D 3000 Beda field Water Injection system at (Kotla) Beda field Project No. O-77 MTC-29-2018
04/06/2018      Tobruk Installation of new foam stations, foam system and tie to Tobruk refinery tanks project No: O-40 MTC-11-2018
04/06/2018      Sarir Construction of the Engineering & Operation Building at Sarir Refinery Project No. M-01 MTC-24-2018
04/06/2018    L.D 3000 Messla Construction of roads to airport and inside field at Messla field Project No. K-34
MTC-25-2018
  Extend L.D 2000 Sarir  Supply and installation of two(2) manual manifold(s) one at GC-6 & one at Sat-14 at Sarir field project No: O-22 MTC-02-2018
    3000 L.D Nafoora Replacement of Three Desalters and Three Oil Heaters at Nafoora CPS (Unit) Project No. J-96 MTC-28-2018
    3000 L.D Qanfooda Construct of Fire Training Ground Facility at Ghanfooda Project No. J-96 MTC-28-2018
    3000 L.D Sarir Extension of control room at GC-4 Sarir field Project No. I-61 MTC-26-2018
 08/05/2018 Extend 3000 L.D Sarir Construction of the Engineering & Operation Building at Sarir Refinery Project No. M-01
MTC-24-2018
  Extend 2000 L.D Benghazi Installation of fire detection system in generator buildings and tie-ins to MACP main Office HQ El-kish project No: J-99 MTC-10-2018
  Extend L.D 1000 Engineering study for Electrical power supply Tie-In projects for (“Ganfouda “UU-VV” at NC-65 “O” at NC-80, “A” at NC-4) MTC-31-2014
      Complete refurbishment of wash tank D-9 and degassing boot at Beda field Project No (P-28) MTC-14-2018
      Refurbishment of four (4) first & second stage desalters At GC-9 Messla Oil field Project No (O-96) MTC-13-2018
      Tobruk The construction of the laboratory building at Tobruk refinery project No: E-33 MTC-07-2018
08/05/2018  Extend   Tobruk Installation of new foam stations, foam system and tie to Tobruk refinery tanks project No: O-40
MTC-11-2018
      Sarir/Messla/Majed Engineering study for the upgrading of existing flare/relief systems at Sarir/Messla/Majed project No: O-26, O-27,O-28 MTC-09-2018
      Tobruk Electrical Engineering study for Tobruk Terminal and refinery power system at Tobruk project No: O-74 MTC-12-2018
      Sarir field Install 2- phase production separator and three shipping pumps at GC-3 project No: M-15 MTC-05-2018

 

 

Login form